- Las Vegas, Nevada
- Total Cost: $1.9 Billion
- Mechanical Contractor: Harris Company
- Project Manager (Mechanical Dry Side): Zackary Lancaster
- Dry-Side: Ductwork, Grease Duct, FCU’s, Air Handlers and PCU’s.
- The upper bowl ductwork was up to 108″ diameter with oval fabric duct (the largest fabric duct project in the U.S).
- Size: 1.8 Million sq ft
- Project Completed: 2020