Project Details

Raider’s Football Stadium Las Vegas

  • Las Vegas, Nevada
  • Total Cost: $1.9 Billion
  • Mechanical Contractor: Harris Company
  • Project Manager (Mechanical Dry Side): Zackary Lancaster
  • Dry-Side: Ductwork, Grease Duct, FCU’s, Air Handlers and PCU’s.
  • The upper bowl ductwork was up to 108″ diameter with oval fabric duct (the largest fabric duct project in the U.S).
  • Size: 1.8 Million sq ft
  • Project Completed: 2020